Item List 051240 |
Date:06/01/2018 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 051240 | Primary Project Number | DE05490010540 |
Contract Description | WENDELL FORD WESTERN KENTUCKY PARKWAY | ||
Primary County | HOPKINS | Fed/St Number | NH 9001 (007) |
Vendor ID | 00818 | Vendor Name | ROGERS GROUP INC |
Bid Amount | $ 4,070,174.01 |
SM- Project | DE05490010540 |
Fed/State Number | NH 9001 (007) |
Project Description | WENDELL FORD WESTERN KENTUCKY PARKWAY |
*********** |
SM- Project | DE05490010540 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0010 | DGA BASE | 00001 | 7,022.000 |
7,022.000 |
$21.080 |
TON | 3.6 |
0020 | CRUSHED AGGREGATE SIZE NO 2 | 00078 | 82.000 |
82.000 |
$45.170 |
TON | 0.1 |
0030 | ASPHALT SEAL AGGREGATE | 00100 | 423.000 |
423.000 |
$56.410 |
TON | 0.6 |
0040 | LEVELING & WEDGING PG64-22 | 00190 | 920.000 |
920.000 |
$58.400 |
TON | 1.3 |
0050 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 8,704.000 |
8,704.000 |
$49.700 |
TON | 10.6 |
0055 | CL2 ASPH BASE 1.00D PG64-22 EDGE DRAIN CAP | 00212 | 563.000 |
563.000 |
$56.060 |
TON | 0.8 |
0060 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 15,261.000 |
15,261.000 |
$49.720 |
TON | 18.6 |
0070 | CL3 ASPH BASE 1.00D PG76-22 | 00216 | 12,219.000 |
12,219.000 |
$55.580 |
TON | 16.7 |
0080 | EMULSIFIED ASPHALT RS-2 | 00291 | 51.000 |
51.000 |
$365.880 |
TON | 0.5 |
0090 | CL2 ASPH SURF 0.50D PG64-22 | 00309 | 2,233.000 |
2,233.000 |
$55.460 |
TON | 3.0 |
0100 | CL3 ASPH SURF 0.50A PG76-22 | 00332 | 6,260.000 |
6,260.000 |
$62.180 |
TON | 9.6 |
0110 | ASPHALT PLACEMENT WITH MTV | 00338 | 33,705.000 |
33,705.000 |
$1.250 |
TON | 1.0 |
0120 | CULVERT PIPE-15 INCH | 00461 | 36.000 |
16.000 |
$65.250 |
LF | 0.1 |
0130 | CULVERT PIPE-18 INCH | 00462 | 369.000 |
369.000 |
$92.350 |
LF | 0.8 |
0140 | CULVERT PIPE-24 INCH | 00464 | 60.000 |
60.000 |
$80.300 |
LF | 0.1 |
0150 | CULVERT PIPE-36 INCH | 00468 | 28.000 |
28.000 |
$115.440 |
LF | 0.1 |
0160 | PERFORATED PIPE-4 INCH | 01000 | 23,012.000 |
23,012.000 |
$4.820 |
LF | 2.7 |
0170 | NON-PERFORATED PIPE-4 INCH | 01010 | 1,950.000 |
1,950.000 |
$14.050 |
LF | 0.7 |
0180 | INSPECT & CERTIFY EDGE DRAIN SYSTEM | 01015 | 1.000 |
1.000 |
$8,030.350 |
LS | 0.2 |
0190 | PERF PIPE HEADWALL TY 1-4 INCH | 01020 | 53.000 |
53.000 |
$401.520 |
EACH | 0.5 |
0200 | PERF PIPE HEADWALL TY 2-4 INCH | 01024 | 27.000 |
27.000 |
$421.590 |
EACH | 0.3 |
0210 | PERF PIPE HEADWALL TY 3-4 INCH | 01028 | 2.000 |
2.000 |
$451.710 |
EACH | 0.0 |
0220 | REMOVE PIPE | 01310 | 32.000 |
32.000 |
$14.050 |
LF | 0.0 |
0230 | METAL END SECTION TY 2-15 INCH | 01380 | 1.000 |
0.000 |
$1,505.690 |
EACH | 0.0 |
0240 | S & F BOX INLET-OUTLET-18 INCH | 01450 | 2.000 |
2.000 |
$2,158.160 |
EACH | 0.1 |
0250 | S & F BOX INLET-OUTLET-24 INCH | 01451 | 3.000 |
3.000 |
$2,710.240 |
EACH | 0.2 |
0260 | S & F BOX INLET-OUTLET-36 INCH | 01453 | 2.000 |
2.000 |
$4,266.120 |
EACH | 0.2 |
0265 | MODIFIED BOX | 20264EC | 1.000 |
1.000 |
$853.220 |
EACH | 0.0 |
0280 | DROP BOX INLET TYPE 5C | 01508 | 7.000 |
7.000 |
$2,810.620 |
EACH | 0.5 |
0290 | DROP BOX INLET TYPE 11 | 01544 | 1.000 |
0.000 |
$2,007.590 |
EACH | 0.0 |
0300 | REMOVE MEDIAN BOX INLET | 01630 | 2.000 |
2.000 |
$276.040 |
EACH | 0.0 |
0310 | CORED HOLE DRAINAGE BOX CON-4 INCH | 01740 | 2.000 |
2.000 |
$200.760 |
EACH | 0.0 |
0320 | BARRICADE-TYPE III | 02014 | 36.000 |
36.000 |
$250.950 |
EACH | 0.2 |
0330 | DITCHING | 02237 | 6,000.000 |
6,000.000 |
$3.810 |
LF | 0.6 |
0340 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 6,795.000 |
6,795.000 |
$15.610 |
LF | 2.6 |
0350 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 1.000 |
1.000 |
$2,860.810 |
EACH | 0.1 |
0360 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 12.000 |
12.000 |
$828.130 |
EACH | 0.2 |
0370 | GUARDRAIL END TREATMENT TYPE 3 | 02373 | 2.000 |
2.000 |
$752.850 |
EACH | 0.0 |
0380 | REMOVE GUARDRAIL | 02381 | 6,955.000 |
6,955.000 |
$1.840 |
LF | 0.3 |
0390 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 9.000 |
9.000 |
$1,982.490 |
EACH | 0.4 |
0400 | CHANNEL LINING CLASS II | 02483 | 438.000 |
438.000 |
$34.130 |
TON | 0.4 |
0410 | SIGNS | 02562 | 1,426.000 |
1,426.000 |
$6.320 |
SQFT | 0.2 |
0420 | EDGE KEY | 02585 | 152.000 |
152.000 |
$165.630 |
LF | 0.6 |
0430 | FABRIC-GEOTEXTILE TYPE IV | 02599 | 795.000 |
795.000 |
$3.260 |
SQYD | 0.1 |
0440 | REMOVE HEADWALL | 02625 | 10.000 |
10.000 |
$271.020 |
EACH | 0.1 |
0450 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$167,543.500 |
LS | 4.1 |
0460 | LANE CLOSURE | 02653 | 8.000 |
8.000 |
$1,189.340 |
EACH | 0.2 |
0470 | VAR MESSAGE SIGN-PORT 3 LINE | 02671 | 2.000 |
2.000 |
$4,256.080 |
EACH | 0.2 |
0480 | SAFELOADING | 02690 | 5.000 |
5.000 |
$135.510 |
CUYD | 0.0 |
0490 | TEMPORARY SILT FENCE | 02701 | 10,000.000 |
10,000.000 |
$2.110 |
LF | 0.5 |
0500 | SILT TRAP TYPE A | 02703 | 1.000 |
1.000 |
$943.570 |
EACH | 0.0 |
0510 | SILT TRAP TYPE B | 02704 | 12.000 |
12.000 |
$240.910 |
EACH | 0.1 |
0520 | CLEAN SILT TRAP TYPE A | 02706 | 2.000 |
2.000 |
$260.990 |
EACH | 0.0 |
0530 | CLEAN SILT TRAP TYPE B | 02707 | 24.000 |
24.000 |
$45.170 |
EACH | 0.0 |
0540 | CLEAN TEMPORARY SILT FENCE | 02709 | 20,000.000 |
20,000.000 |
$1.100 |
LF | 0.5 |
0550 | STAKING | 02726 | 1.000 |
1.000 |
$17,566.390 |
LS | 0.4 |
0560 | FLASHING ARROW | 02775 | 2.000 |
2.000 |
$3,208.060 |
EACH | 0.2 |
0570 | REPAIR EXISTING BLOWUP | 03247 | 800.000 |
800.000 |
$122.560 |
SQYD | 2.4 |
0580 | EROSION CONTROL BLANKET | 05950 | 22,962.000 |
22,962.000 |
$1.330 |
SQYD | 0.8 |
0590 | TEMPORARY MULCH | 05952 | 35,000.000 |
35,000.000 |
$0.150 |
SQYD | 0.1 |
0600 | TEMP SEEDING AND PROTECTION | 05953 | 5,000.000 |
5,000.000 |
$0.280 |
SQYD | 0.0 |
0610 | TOPDRESSING FERTILIZER | 05966 | 3.000 |
3.000 |
$451.710 |
TON | 0.0 |
0620 | SEEDING AND PROTECTION | 05985 | 10,000.000 |
10,000.000 |
$0.400 |
SQYD | 0.1 |
0630 | PAVE STRIPING-TEMP PAINT-6 IN | 06511 | 68,886.000 |
68,886.000 |
$0.200 |
LF | 0.3 |
0640 | PAVE STRIPING-THERMO-6 INCH W | 06542 | 30,453.000 |
30,453.000 |
$0.650 |
LF | 0.5 |
0650 | PAVE STRIPING-THERMO-6 INCH Y | 06543 | 24,362.000 |
24,362.000 |
$0.650 |
LF | 0.4 |
0660 | PAVE STRIPING-TEMP REM TAPE-B | 06549 | 1,200.000 |
1,200.000 |
$2.960 |
LF | 0.1 |
0670 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 2,700.000 |
2,700.000 |
$1.190 |
LF | 0.1 |
0680 | PAVE STRIPING-TEMP REM TAPE-Y | 06551 | 2,700.000 |
2,700.000 |
$1.190 |
LF | 0.1 |
0690 | PAVEMENT MARKER TYPE V-B W/R | 06592 | 305.000 |
305.000 |
$21.330 |
EACH | 0.2 |
0700 | REMOVE PAVEMENT MARKER TYPE V | 06600 | 10.000 |
10.000 |
$6.370 |
EACH | 0.0 |
0710 | CONCRETE-CLASS A | 08100 | 9.630 |
8.430 |
$953.600 |
CUYD | 0.2 |
0720 | STEEL REINFORCEMENT | 08150 | 80.000 |
68.000 |
$2.310 |
LB | 0.0 |
0730 | SHOULDER RUMBLE STRIPS-SAWED | 20362ES403 | 48,724.000 |
48,724.000 |
$0.280 |
LF | 0.3 |
0740 | SILT TRAP TYPE C | 20496NS843 | 6.000 |
6.000 |
$240.910 |
EACH | 0.0 |
0750 | CLEAN SILT TRAP TYPE C | 20497NS843 | 12.000 |
12.000 |
$40.150 |
EACH | 0.0 |
0760 | INSTALL PROJECT IDENTIFICATION SIGNS | 20588NC | 2.000 |
2.000 |
$463.370 |
EACH | 0.0 |
0770 | REMOVE RAISED MEDIAN | 20754EC | 11,481.000 |
11,481.000 |
$10.390 |
LF | 2.9 |
0780 | PAVEMENT REPAIR | 20757ED | 733.000 |
733.000 |
$115.520 |
SQYD | 2.1 |
0790 | INSTALL PROJECT ID SIGN (72" X 120") | 21132NC | 2.000 |
2.000 |
$463.370 |
EACH | 0.0 |
0820 | SLOPED BOX OUTLET TYPE 1-15 IN | 01432 | 0.000 |
1.000 |
$1,550.000 |
EACH | 0.0 |
0830 | DROP BOX INLET TYPE 2 | 01493 | 0.000 |
1.000 |
$3,220.000 |
EACH | 0.0 |
0840 | SAFETY BOX INLET-18 IN DBL SDB-5 | 01728 | 0.000 |
2.000 |
$6,320.000 |
EACH | 0.0 |
Category Total $3,909,488.95 |
SM- Project | DE05490010540 | CATEGORY NUMBER | 0002 | CATEGORY Description | DEMOBILIZATION & MOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0800 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$91,652.880 |
LS | 2.3 |
0810 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$69,032.170 |
LS | 1.7 |
Category Total $160,685.05 |